Construction works of quay No. 0 of the Paldiski Northern Port

Valminud: 2014

Projekti kirjeldus

A new quay with a ramp for ro-ro ships was constructed. Percussion drilling was used for the installation of pipe piles. Project volume: Length 320 linear metres. Depth in front of the quay 10 m. Parking areas 17, 700m². Construction period: September 2012 – December 2013.